This is a Project from Client who owns a lakehouse that was built in the late 1990s. The Client would like to update the front elevation and landscaping. The Briefing are:
1.Painting the brick
2.Removing the large dormer window above the front door
3. Changing the garage door
4.Changing the front door
5.Changing the landscaping material (plants)